Data centre in Ethiopia — Uminers Ethiopia

from $0.055

per kWh

175 MW

Available capacity of the site

98%

Uptime

Ethiopia

Why Ethiopia?

Low electricity rates ($0.055) and full exemption from import duties and taxes within the Free Economic Zone (FEZ).

The projected return on investment in hardware (e.g. Antminer S21+) is from 18 months at the current BTC exchange rate ($85,246).

1. Investment license: Official import of equipment under the terms of free economic zone (FEZ). 2. Contract with Ethiopian Electric Utility (EEU): Official contract for the supply of hydroelectric power. 3. Insurance of equipment at all stages.

Fast equipment delivery (10 — 14 days) with simplified customs clearance.

The use of 98% renewable hydropower complies with international ESG standards, which makes the project particularly interesting for sustainability-oriented companies and foundations

The ability to host from 175 KW allows for a flexible start, while preferential terms for volumes from 5 MW make scaling more profitable

Uminers Ethiopia offers a unique environment for mining: a stable climate between 10-25°C and some of the lowest rates on the market, which differentiates the site from locations in Asia and North America.

Economic efficiency

Economic efficiency

Low electricity rates ($0.055) and full exemption from import duties and taxes within the Free Economic Zone (FEZ).
High profitability

High profitability

The projected return on investment in hardware (e.g. Antminer S21+) is from 18 months at the current BTC exchange rate ($85,246).
Full legal security

Full legal security

1. Investment license: Official import of equipment under the terms of free economic zone (FEZ). 2. Contract with Ethiopian Electric Utility (EEU): Official contract for the supply of hydroelectric power. 3. Insurance of equipment at all stages.
Promptness and reliability

Promptness and reliability

Fast equipment delivery (10 — 14 days) with simplified customs clearance.
Environmental sustainability

Environmental sustainability

The use of 98% renewable hydropower complies with international ESG standards, which makes the project particularly interesting for sustainability-oriented companies and foundations
Flexibility and scalability

Flexibility and scalability

The ability to host from 175 KW allows for a flexible start, while preferential terms for volumes from 5 MW make scaling more profitable
Competitive advantage

Competitive advantage

Uminers Ethiopia offers a unique environment for mining: a stable climate between 10-25°C and some of the lowest rates on the market, which differentiates the site from locations in Asia and North America.

About data centre

about__block
about__block
about__block
about__block

175+ MW

Total site capacity

4

Capital
constructions

total capacity — 100 MW

Cutting-edge containers

for air and hydro-cooling — 75 MW

10 000 m ²

Total area of the site

Own service
centre

200 m ²

Administrative section

50 000

innovative devices

Devices with
hydrocooling

Ability to install:
S21E XP Hyd, S21 XP Hyd, S21+ Hyd, S21 XP+ Hyd

Easy to get started: mining as an turnkey solution

Just invest — we’ll implement everything.

easy
easy__item

Personalised investment plan

We will make a personalised plan with calculation of payback and profitability. It will be ready in 24 hours.

easy__item

Purchase and delivery of equipment

The devices are purchased directly from the manufacturer.
Delivery to the data centre is 10-14 days.

easy__item

Hosting in a data centre in Ethiopia

The project is implemented by the official unit of Uminers
--Uminers Ethiopia.
Contract with EEU provides a 
guaranteed supply of hydropower. Start-up of the equipment
 — within 72 hours after delivery.

easy__item

Online monitoring 24/7

You can always see how your equipment is working — directly
on your phone. Our own monitoring system gives you complete transparency.

easy__item

Service maintenance

The facility has its own service centre.

plans_bg

Investment plans

from 5 MW 
on request

Electricity consumption:

from 5 MW

Electricity rate:

on request

ROI:

from 21 mo.

Investment volume:

from $ 3 954 500

from 3 MW 
0,056 $

Electricity consumption:

from 3 MW

Electricity rate:

0,056 $

ROI:

from 22 mo.

Investment volume:

from $ 2 732 700

from 1 MW 
0,058 $

Electricity consumption:

from 1 MW

Electricity rate:

0,058 $

ROI:

from 22,3 mo.

Investment volume:

from $ 790 900

from 100 units
$ 0.062

Electricity consumption:

from 336 kW

Electricity rate:

0,062 $

ROI:

from 22,9 mo.

Investment volume:

from $ 287 600

from 50 units
$ 0.065

Electricity consumption:

from 168 kW

Electricity rate:

0,065 $

ROI:

from 23.4 mo.

Investment volume:

from $ 143 000

Case of purchase on air-cooled equipment

Antminer S21+ 216 Th

Income per month: 79 819,6 $

Costs per month: 41 672,4 $

Profit per month: 38 147,2 $

Payback period (mo): 26,15 mo

Case of purchase hydro-cooled equipment

Antminer S21e XP Hyd 3U 860 Th

Income per month: 304 700,4 $

Costs per month: 120 363,6 $

Profit per month: 184 336,8 $

Payback period (mo): 26,46 mo

Case of purchase hydro-cooled equipment

Antminer S21+ Hyd 395 Th

Income per month: 304 700,4 $

Costs per month: 120 363,6 $

Profit per month: 184 336,8 $

280 units

Antminer S21+ 216 Th

  • Consumption: 1 MW
  • Total cost: 997 640 $
  • Logistics & Installation: included
  • Electricity rate: 0,058 $
267 units

Antminer S21e XP Hyd 3U 860 Th

  • Consumption: 3 MW
  • Total cost: 5 430 780 $
  • Logistics & Installation: included
  • Electricity rate: 0,056 $
840 units

Antminer S21+ Hyd 395 Th

  • Consumption: 5 MW
  • Total cost: 5 281 920 $
  • Logistics & Installation: included
  • Electricity rate: 0,055 $
280 units

Antminer S21+ 216 Th

  • Consumption: 1 MW
  • Total cost: 997 640 $
  • Logistics & Installation: included
  • Electricity rate: 0,058 $
Antminer S21+ 216 Th
Income per month: 79 819,6 $
Costs per month: 41 672,4 $
Profit per month: 38 147,2 $
Payback period (mo): 26,15 mo
267 units

Antminer S21e XP Hyd 3U 860 Th

  • Consumption: 3 MW
  • Total cost: 5 430 780 $
  • Logistics & Installation: included
  • Electricity rate: 0,056 $
Antminer S21e XP Hyd 3U 860 Th
Income per month: 304 700,4 $
Costs per month: 120 363,6 $
Profit per month: 184 336,8 $
Payback period (mo): 26,46 mo
840 units

Antminer S21+ Hyd 395 Th

  • Consumption: 5 MW
  • Total cost: 5 281 920 $
  • Logistics & Installation: included
  • Electricity rate: 0,055 $
Antminer S21+ Hyd 395 Th
Income per month: 304 700,4 $
Costs per month: 120 363,6 $
Profit per month: 184 336,8 $

Profitability calculator

Sealminer A2

Sealminer A2

Sealminer A2

3 096.8 $

  • Algorithm SHA-256
  • Hashrate 226.0 TH/s
  • Power 3729 W
Learn more

Antminer S21 XP

Antminer S21 XP

Antminer S21 XP

6 495 $

  • Algorithm SHA-256
  • Hashrate 270.0 TH/s
  • Power 3645 W ± 5%
Learn more

Antminer L9

Antminer L9

Antminer L9

9 013.2 $

  • Algorithm Scrypt
  • Hashrate 16.0 GH/s
  • Power 3362 W ± 5%
Learn more

Antminer KS5

Antminer KS5

Antminer KS5

1 197.7 $

  • Algorithm kHeavyHash
  • Hashrate 20.0 TH/s
  • Power 3000 W ± 5%
Learn more

Antminer KS5 Pro

Antminer KS5 Pro

Antminer KS5 Pro

1 299.2 $

  • Algorithm kHeavyHash
  • Hashrate 21.0 TH/s
  • Power 3150 W ± 5%
Learn more

Antminer S21 Pro

Antminer S21 Pro

Antminer S21 Pro

3 965.7 $

  • Algorithm SHA-256
  • Hashrate 234.0 TH/s
  • Power 3510 W ± 5%
Learn more

Antminer S21

Antminer S21

Antminer S21

2 293.9 $

  • Algorithm SHA-256
  • Hashrate 195.0 TH/s
  • Power 3420 W ± 5%
Learn more

Antminer L7

Antminer L7

Antminer L7

4 059 $

  • Algorithm Scrypt
  • Hashrate 9.1 GH/s
  • Power 3260 W ± 10%
Learn more

Antminer T21

Antminer T21

Antminer T21

2 468.5 $

  • Algorithm SHA-256
  • Hashrate 190.0 TH/s
  • Power 3610 W ± 5%
Learn more

Antminer S21+

Antminer S21+

Antminer S21+

3 265.3 $

  • Algorithm SHA-256
  • Hashrate 225.0 TH/s
  • Power 3712.5 W ± 5%
Learn more

Antminer S21+

Antminer S21+

Antminer S21+

3 410.4 $

  • Algorithm SHA-256
  • Hashrate 235.0 TH/s
  • Power 3877.5 W ± 5%
Learn more
  • Power consumption:
  • Electricity rate

Month

Year

Rev. $

Cost

Profit

ROI

Profitability per annum

20%
Learn more